Texas Data Center Construction Projects

Understand the investment. Find the emerging locations. Go from the big picture to the public record.

Search sector filings

Sector composition

How much is still active?

77.1%of estimated value
Active in snapshot
$74.2B
Other tracked filings
$22.1B

Active means the filing’s estimated completion was on or after the snapshot date. Other filings are not necessarily completed.

Texas · TDLR public records

Sector snapshot

Total estimated construction value

$96.3B

687
Filings tracked
61
Counties
112
Cities

Sector totals computed October 1, 2026.

Explore filings
Zabalist / visual intelligence

The projects behind the numbers

Explore the shape of investment, compare individual filings, and see their estimated completion dates. Select a project to inspect its record.

15 featured TDLR filings · not the entire sector
Estimated construction value$22.6BSum of 15 shown records with value
Records in view15 / 15Ready to inspect and compare
Largest record’s share10.6%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value
15 featured TDLR filings · not the entire sector

Comparisons use only these 15 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

The sector, explained

Where are data centers being built in Texas?

Texas leads the United States in new data center construction. Zabalist tracks 687 data center construction projects filed with Texas regulators across 61 counties — a combined $96.3B in estimated value, including $74.2B across 154 projects still actively under construction or in review. The largest clusters are in Dallas–Fort Worth, the Austin corridor, San Antonio, and land- and power-rich West Texas. Each project below links to its verified permit record — location, developer, estimated cost and projected completion — drawn from Texas Department of Licensing and Regulation (TDLR) public filings.

Texas hyperscale data center permits by county

Data center construction filings are concentrated in a handful of Texas counties. Taylor County (Abilene) leads with roughly $13.4 billion in registered value, followed by Shackelford County — where Vantage Data Centers filed ten Project Frontier buildings worth about $10.6 billion in June 2026 — then Dallas, Tarrant and Ellis counties in the DFW metroplex. The table below shows every major county’s TDLR filing count, combined estimated value, active projects, and largest single filing.

County concentration

Where the investment lands

Select a county. Change the measure to see a different side of the market.

14 counties in this snapshotEstimated value
View the county source data

Counts cover all data center construction filings registered with TDLR that Zabalist tracks, including completed projects; "active" filings have an estimated completion date still ahead. A campus may register multiple buildings or phases as separate filings. County totals verified against TDLR public records on July 5, 2026.

Where Texas data centers are being built

Dallas–Fort Worth

The largest concentration — Garland, Dallas, Midlothian (Ellis), Whitney (Bosque), Fort Worth, and Corsicana (Navarro).

Greater Austin

A fast-growing corridor southeast of Austin: Maxwell & Lockhart (Caldwell), Cedar Creek (Bastrop), and Hutto (Williamson).

San Antonio

Castroville (Medina) anchors the San Antonio cluster with the multi-building SAT campuses.

West Texas & the Panhandle

Land- and power-rich sites near Abilene (Taylor and Shackelford, where Vantage’s multi-building Project Frontier campus filed in June 2026), Afton (Dickens), Claude (Armstrong), and Miami (Gray).

Browse any city or search all Texas construction projects.

Why is Texas getting so many data centers?

Three structural advantages concentrate hyperscale construction in Texas: an independent power grid operated by ERCOT that lets large loads interconnect comparatively quickly, abundant inexpensive land in rural counties, and a business-tax climate that has long attracted capital-intensive industrial projects. The result is visible in the permit record — the 154 active data center projects Zabalist tracks represent roughly $74.2B of in-flight construction, from the DFW metroplex to the Panhandle.

These figures are derived from construction filings registered with the Texas Department of Licensing and Regulation. See our data sources for methodology and provenance.

Bidding on a Texas data center project?

Data center construction runs on electrical, mechanical and concrete trades. Find verified Texas contractors with real permit history, or track who is winning the work:

Explore Texas construction by sector

Texas data center construction — FAQ

Where are data centers being built in Texas?

Texas data center construction spans dozens of counties. The biggest clusters are Dallas–Fort Worth (Garland, Dallas, Midlothian, Whitney, Corsicana), the Austin corridor (Maxwell, Lockhart, Cedar Creek, Hutto), San Antonio (Castroville), and land- and power-rich West Texas and Panhandle sites near Abilene, Afton, Claude and Miami.

How many data centers are being built in Texas?

Zabalist tracks 687 data center construction projects filed with Texas regulators, with 154 currently active (in review or registered, completion still ahead) representing about $74.2B in estimated value. The full set totals roughly $96.3B. Figures are sourced from TDLR public records and updated as new filings post.

What is the largest data center project in Texas?

Among individual TDLR filings, the Abilene AI data center campus in Taylor County carries the highest estimated value at roughly $6.3 billion per building. The largest multi-building campus by combined filings is Vantage Data Centers’ Project Frontier in Shackelford County, northeast of Abilene — ten buildings registered in June 2026 totaling roughly $10.6 billion. Other multi-billion-dollar projects include Edged Energy near Austin (Caldwell County) and Galaxy Helios in Dickens County.

How can I find data center construction projects to bid on in Texas?

Each project on Zabalist links to its full permit record with the owner, developer, location and timeline. Electrical, mechanical and concrete subcontractors can use the verified contractor directory and the active Texas bids feed to identify projects and the firms working on them before construction ramps up.

Is Texas data center construction data public record?

Yes. Commercial construction in Texas is registered with the Department of Licensing and Regulation (TDLR) for accessibility review, creating a public record of the project, its location, estimated cost and status. Zabalist aggregates these filings; it does not publish confidential or proprietary information.