Design review complete, construction may proceed
Texas State Hilltop Housing Phase II is a New Construction project located at 305 Mathews Street in San Marcos, Texas. The project has an estimated value of $227.6M covering 386,112 sq ft. Texas State University System is the property owner and Kirksey Architecture is the design firm of record. The project was registered with TDLR on December 10, 2025.
386,112 SF Housing
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 10, 2025
Review Complete
Dec 10, 2025
Inspection Complete
Closed
Building permits found at or near this location
interior remodel - see attached document
We will be adding mulitple panels and receptacles for tenant to put in equipment and office area. There will be no additional meter needed. 40 20A 120V. DUPLEX RECEPTACLE 7 - 20A 120V. QUADRAPLEX RECEPTACLE These 120V outlets being installed are standard NEMA 5-20 (20A 125V duplex outlets). Each will have an FLA of 10A and will be wired with #12 CU stranded wire. There are also: (5) 125A 480V equipment feeds with a safety disconnect and #1 CU wire (3) 70A 480V equipment feeds with a safety disconnect and #4 CU wire (3) 30A 208V equipment feeds with a safety disconnect and #10 CU wire
Install new transformer and 400A sub panel Ok Per Steve Leitch. Reference 2025 146628 DA
Replacement of mini-split system
Replace remaining cast iron drains under home. Install new sewer line from city tap and connect to home.