Project intelligenceTDLR TABS2022025431Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

H5 Colocation Facility - 100 Taylor St

100 Taylor Street, San Antonio, TX, 78205

Construction complete · Oct 2024Project Closed

H5 Colocation Facility - 100 Taylor St is a renovation/alteration project at 100 Taylor Street, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $2.0M across about 20,400 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
20,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$98/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 4, 2022789 days across supplied datesOct 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    57 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    732 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About H5 Colocation Facility - 100 Taylor St

The H5 Data Center renovation at 100 Taylor Street in San Antonio is a 20,400 sq ft project with an estimated cost of $2,000,000. Filed under the name H5 Colocation Facility - 100 Taylor St, the work involved converting existing space into a new data hall, adding electrical rooms, and installing a secure entrance. The owner of record is H5 Data Centers - SAN Antonio LLC, and the project was privately funded on private land.

Construction began in September 2022, following TDLR registration in August 2022. The scheduled completion date was October 2024. Batir Architecture, Ltd served as the design firm, and Justin K Walton was the registered accessibility specialist for the project. The scope included exterior equipment placement and internal infrastructure upgrades to support colocation services.

The estimated cost of $2,000,000 places this project above the median estimated cost for renovation/alteration filings in Bexar County, which is $250,000. The project’s size of 20,400 sq ft is also larger than the county median of 4,125 sq ft. The cost per square foot is $98, which is above the county median of $85. The scheduled build window of 732 days is longer than the county median of 102 days.

TDLR closed the project file in October 2024, which marks the end of the accessibility review process for this construction. The project status is listed as Project Closed. City of San Antonio permit records show five permits on file at this street address, issued between August 2025 and November 2025, including one each for commercial remodeling, electrical, plumbing, plumbing irrigation, and minor commercial repair.

Third-party sources describe the facility as part of H5 Data Centers’ network in San Antonio. A post by datacenterdynamics.com noted that the San Antonio facility received a fiber expansion by FiberLight. Another source, datacenter.fyi, described the project as a colocation buildout developed by H5 Data Center in San Antonio. The location is situated in Bexar County, with the surrounding ZIP code 78205 having a population of about 1,653 and a median household income of $34,631 according to U.S. Census ACS 2023 five-year estimates.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78205 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

H5 Colocation Facility - 100 Taylor St is a Renovation/Alteration project located at 100 Taylor Street, San Antonio, TX 78205 in San Antonio, Texas. The project has an estimated value of $2.0M covering 20,400 sq ft. H5 DATA CENTERS - SAN ANTONIO LLC is the property owner and Batir Architecture, Ltd is the design firm of record. The project was registered with TDLR on August 4, 2022.

Frequently Asked Questions

Is the H5 Data Center in San Antonio open?

The TDLR record indicates the construction project is closed. A post by datacenterdynamics.com reported that the facility received a fiber expansion, but the TDLR file does not confirm business opening status.

Who is the owner of the H5 Data Center project?

The owner of record for the project at 100 Taylor Street is H5 Data Centers - SAN Antonio LLC.

What was the scope of the renovation?

The scope included renovation of existing data center space to include a new data hall, electrical rooms, secure entrance, and exterior equipment placement.

When did construction start and finish?

Construction started in September 2022, and the TDLR file was closed in October 2024, marking the end of the accessibility review process.

Who was the design firm for this project?

Batir Architecture, Ltd was the design firm of record for the H5 Data Center renovation project.

What is H5 Colocation Facility - 100 Taylor St?

H5 Colocation Facility - 100 Taylor St is a renovation/alteration project at 100 Taylor Street in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing data center space to include new data hall, electrical rooms, secure entrance and exterior equipment placement

Is H5 Colocation Facility - 100 Taylor St open in San Antonio?

Construction on H5 Colocation Facility - 100 Taylor St is complete — TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.

Where is H5 Colocation Facility - 100 Taylor St located?

H5 Colocation Facility - 100 Taylor St is located at 100 Taylor Street, San Antonio, TX, 78205, in Bexar County.

Who is the owner or developer of H5 Colocation Facility - 100 Taylor St?

H5 DATA CENTERS - SAN ANTONIO LLC is the property owner/developer of record for H5 Colocation Facility - 100 Taylor St, per its TDLR project registration.

Who is the architect or design firm for H5 Colocation Facility - 100 Taylor St?

Batir Architecture, Ltd is the design firm of record for H5 Colocation Facility - 100 Taylor St, according to its TDLR filing.

How much does H5 Colocation Facility - 100 Taylor St cost and how big is it?

H5 Colocation Facility - 100 Taylor St has an estimated construction value of $2.0M and approximately 20,400 square feet (about $98/sqft), based on its TDLR filing.

Scope of Work

Renovation of existing data center space to include new data hall, electrical rooms, secure entrance and exterior equipment placement

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

100 Taylor Street, San Antonio, TX, 78205

Location by street address

Related City Permits

Building permits found at or near this location

100 TAYLOR ST, City of San Antonio, TX 78205

Building No: 100; Unit No: N/A

IssuedExistingExistingNov 2025
SAT-COM-RML-PMT25-40000821
100 TAYLOR ST, City of San Antonio, TX 78205
IssuedMinor Commercial Repair PermitAug 2025
SAT-REP-CRP-PMT25-35400353

Watch all construction in 78205 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Bexar

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists